Asset Integrity & Repair Solutions

Inspection shows where an asset is at risk. Through our joint venture partnership, NNDT now also offers the engineered repair, leak sealing, leak detection and valve services that turn those findings into fixes, designed to international standards and, in most cases, installed while the plant keeps running.

01
INSPECT

NDT, specialised inspection and leak detection find the defect

02
ASSESS

Engineering assessment and repair design

03
REPAIR

Composite repair or live leak sealing on site

04
VERIFY

Quality control, records and guarantee

Zero

shutdowns — repairs on live, pressurised systems

20 yrs

design life for composite repairs

−50 to 232 °C

composite operating temperature range

< 24 h

quote turnaround on repair enquiries

COMPOSITE (FIBRE-WRAP) REPAIR
Engineered carbon-fibre and composite systems reinforce damaged pipelines, tanks, vessels and flanges to the strength of the original material. Applied by hand lamination or infusion, they are cost-effective, durable and quick to install with no limit on pipe diameter. Every repair is designed to ASME PCC-2 and/or ISO/TS 24817 and signed off by a professional engineer.

Repairs: internal and external corrosion • erosion • weld anomalies • mechanical damage • through-wall defects • ageing infrastructure
Composite Grade Standard Medium Temperature High Temperature Very High Temperature
Operating temperature −60 to 84 °C −50 to 109 °C −50 to 211.8 °C −50 to 232 °C
Set time at 25 °C 4 hours 4 hours 14 hours 20 hours
Repair design life 20 years 20 years 20 years 20 years
Live Leak Sealing & Leak Detection
Online Leak Sealing

Engineered leak-sealing clamps, manufactured to ASME Section VIII Div. 1, stop active high-pressure leaks without shutting down or isolating the system. A low-profile design allows a composite overwrap as the permanent repair. Suitable for oil, gas, mining, petrochemical and water service.

Clamp Specification Value
Design pressure / temperature 200 bar / 300 °C
Pipe diameter 1" to 56"
Maximum defect 25 mm
Installation about 10 minutes, one person
Applications Elbows, straights and welds; pinholes, through-wall corrosion
Our Repair Process
Step What Happens
1. Assess The client describes the anomaly on an engineering assessment form; inspection data from NNDT supports it.
2. Design Repair recommendation and design calculations to ASME PCC-2 / ISO/TS 24817, signed off by a professional engineer.
3. Supply Materials supplied to the design calculations for each repair.
4. Install Installation and quality control by qualified installation engineers.
5. Guarantee Quality-control records reviewed and the repair guaranteed.
Leak Detection

Three complementary technologies locate losses quickly — without digging blindly or shutting down.

Satellite AI

Satellite imagery and AI narrow a water network down to small, prioritised zones. About 80% of leaks are found in 20–30% of the network; first results in about 2 weeks.

In-Line Inspection

Free-floating multi-sensor devices travel inside live pipelines from 2" — any material, including unpiggable lines — reporting wall condition, deposits and leaks.

Acoustic Correlation

Acoustic sensors along the line, combined with AI, triangulate leak positions from sound-wave time delays for precise, focused repairs.

Proven in the Field
Selected projects completed by our joint venture team.
R25M+
production loss avoided
OIL REFINERY • CAPE TOWN
12" PIPELINE REPAIR

An 823 mm internal corrosion defect on a buried line, wrapped with an engineered composite to ISO/TS 24817 in about 3 days — no shutdown, 20-year guarantee.

R1.38M
saved
PLATINUM CONCENTRATOR
SLURRY KNIFE GATE VALVES

Competitor valves failed in under 3 weeks on highly erosive slurry. Heavy-duty knife gates with duplex blades ran for 12 months continuously.

R10.15M
annual water losses stopped
BULK WATER UTILITY • 44 KM MAIN
BULK MAIN LEAK SURVEY

Satellite detection and an in-line run inside the live pipeline found 17 unknown leaks; repairs within two weeks, payback in under two months.

R8M+
shutdown and replacement avoided
FLOCCULANT TANK • RUSTENBURG
300 M³ LIVE TANK REPAIR

Severe internal corrosion and a pinhole repaired with impact-resistant composite in six sections — zero downtime.

R16M
production loss avoided
OIL REFINERY • CAPE TOWN
9 M CORROSION DEFECT

A 9 000 mm internal corrosion defect spiral-wrapped over 9.3 m to ASME PCC-2 in about 5 days, with no shutdown.

3 weeks
vs 18-week industry lead time
BULK WATER UTILITY
DN900 BUTTERFLY VALVES

Two DN900 valves sourced and delivered for a critical intervention about 105 days earlier than planned.

Industries We Serve
Mining • Water & wastewater • Oil & gas • Petrochemical • Power generation • Pulp & paper • Transmission pipelines • Offshore & marine